Knowledge Base

Article ID: 656 - Last Modified: December 14, 2011

I started a job to screen a million molecules, and it stopped before finishing. How can I recover my results and finish the docking run?

First, note that a job with one million molecules is too large a job for a single Glide process. You should distribute such large screens by splitting the job into many subjobs, and if possible distribute it over multiple processors (these are options in the Start dialog box). Even if you use only a single processor, splitting the job into subjobs avoids problems with a single large job failing and makes it easier to restart. We suggest making the subjobs no larger than 50000 molecules.

To recover your existing results, copy the jobname_raw.maegz file from the job's scratch directory, if it still exists, to a safe location. The scratch directory is tmpdir/username/jobname/, where tmpdir is defined in your hosts file ($SCHRODINGER/schrodinger.hosts by default) for the host entry you used for the job. If this file is not there, you will have to rerun the entire job.

If you recover the existing results, to finish the job, copy the original jobname.in file to give it a new name, then add the keyword LIGAND_START to the file with the new starting ligand number as its value. This should be the ligand that the original job failed on.

If your recovered _raw.mae file contains more than 100K docked poses, you won't be able to sort it using $SCHRODINGER/utilities/glide_sort; instead, you'll have to divide the file into subsets with $SCHRODINGER/utilities/maesubset. Then combine these sorted subsets with the _pv.mae or _lib.mae file from the new job with $SCHRODINGER/utilities/glide_merge.

Keywords: large job , subjobs, recover raw file, scratch directory, LIGAND_START keyword, merging results

Related Articles:

#1589: I submitted a Glide docking job to our cluster a couple of weeks ago and we just had a system failure that caused our...
#1054: How can I restart a Glide docking calculation for which some subjobs failed?
#1634: My serial Glide job was interrupted. Can I resume the job without losing the results of ligands already docked in the...

Back to Search Results

Was this information helpful?

What can we do to improve this information?


If you need additional help, please email us at help@schrodinger.com.
Knowledge Base Search

Type the words or phrases on which you would like to search, or click here to view a list of all
Knowledge Base articles